Saturday, December 19, 2009

Vieques Part 2


Saturday turned out to be the day we had the guided bike tour for half a day with Gary from www.viequesadventures.com . Since he was generous enough to give us the bikes Friday because of the rearranging we had gone all around Esperanza. He popped us in his truck and we headed to the other side of the island and started out near this Ceiba tree. I can't wait for my Ceiba to start getting roots like this - unfortunately I won't live long enough to have a 300 year old tree like this in my lifetime!

Here's Jeff near the giant roots.

Jeff and I in a pose near the roots. How fun to grow up here and use this as a fort! It is a really cool tree. We hopped on bikes and went 1.5 miles to the end of the pier for some instruction on shifting and a little island history, then back out and off down some trails. Gary has a permit to take people into government owned property that is also, I think, protected wildlife area (actually I think the whole island is protected). Anyway, the wonderful thing was that there were nice trails, some small paved roads, a little mud and puddles, sand, and NO CARS. This made it real fun without worries or looking over your shoulder. We cruised around past government bunkers and some large installation of some kind that was all fenced and said no photos. We made stops to talk about some of the fruits and shrubs along the way and then went into some ruins of old sugar processing areas.

This is an old sugar processing area that is falling apart. It was really neat to see.

We stopped to add flowers to my helmet...and finally climbed a few hills and ended up back in Esperanza where we were staying. We probably went 15 miles I am thinking. Something over 10 anyway. We took a quick shower, checked out, and had an hour or more before our transportation came.

So we went for a final meal at Tradewinds. I had had the seared tuna/olive/egg/greens/tomatoes etc salad yesterday and Jeff ordered it this time. I had ice coffee and a bacon/turkey/cheese wrap that was very good.


After that we took another quick stroll down town then back to the hotel. The public transportation was already there and for 5 bucks each we were off to the airport. We "checked in" which essentially is giving your name and waited about 15 minutes before taking off. Doesn't get any easier than that!

Monday, December 14, 2009

The "White Sea" of Salinas - a Kayaking Excursion

After a few emails and multiple times trying to connect with the Sierra Club we lucked out when Jeff emailed an English speaking trip leader - Jose - who gave us all the needed details so we could join the group on an excursion to "Blanco Mar" (the White Sea) in Salinas. Jeff had gone to Salinas spearfishing, but there are many cays and we really wanted to join this group because they go to all kinds of places you will never find out about otherwise. Also they are like-minded people who know things we don't about ecology. There is "Blanco Mar" and across from it "Negra Mar" or the "black" sea. They are named for the tannin or lack of tannin excreted by the particular type of mangrove that lives there. There is a lot to learn and I may not have it all straight but I believe there are 4 types of mangroves: red, black, white and another that it is disputed as to whether or not it is a mangrove. They all have the ability to remove salt from the water but do it in different ways. The red mangroves live completely in the water and have a couple of organs at the base of the leaves that process the salt out. The white mangroves live more in sand and excrete salt out the leaf surface. I think the black ones are in the water (not sure). We saw blooming mangroves that had little fruits, and the cool thing is that they do not produce seeds, the "fruit" matures in place and sends a long root like thing down to the water as a way of propagating. Really cool!

Here we all are gathering at the launch site waiting for a few lost people. It is a beautiful, calm, sunny day and I am just in a bathing suit like most of the people.

We kayaked about 4 miles maybe (kind of my limit if it is windy) and because we started a little late it got very windy. I hate the wind. I REALLY hate kayaking in the wind. We went through some mangrove areas and then got some information about the ecosystem on a little beach and then had to cross to another cay. The wind and waves had picked up some but we made it across. We stayed on this cay for the remainder of the time swimming and chatting. Then a huge squall came through - one that you could not be on the water in. It rained, it got really cold, it got super windy. I was frozen. It was warmer in the water so we stayed there and finally I was too cold so I put on my only shirt, both our life vests and my lycra skin. Still cold. Then puuufff it disappeared and got nice again.

On the other side of our little cay it was calmer and warmer but more exposed to the outside reef. Jeff tried to kayak "surf" and I looked around at small life. I really enjoyed the plants going in one direction and the neat water ripples going in another.

The roots are so ornate - like baskets.

We went through many "tunnels" which is what we like best. The water wasn't clear so we didn't snorkel or see many fish but usually you can see schools of baby fish in mangrove areas - mangroves are a sort of nursery for fish.


The roots are really interesting.

It was still windy and a little rough for me on the way back so I got lazy and Jeff towed me. I did paddle but really he did most of the work. He is strong and knows that paddling isn't my thing. I view the kayak as a way to get to somewhere so I can float and wait to see things. He prefers to paddles for miles and miles just to paddle. The Sierra Club is doing a lot to preserve and protect areas like the mangroves. They have mobilized fishermen and made it worth their while to protect areas they have historically dumped garbage in, over fished or harvested wood from. Now they receive money for parking ($5 bucks a car), they get some of the money from the club, and the biologists don't have to act like enforcers or enemies. The locals now are selling fried fish and tostones to groups that come through and are keeping garbage off the road and see this as an opportunity and not a take over. That balance is always hard to achieve anywhere. They are trying to set up similar arrangements in other areas of forest and mangroves to help keep some of these areas wild. We are looking forward to the next outing. It probably won't be kayaking, but I'd like to visit some of the organic farms on the island, go on some identification hikes etc etc. They do some really neat camping/hiking/kayaking trips that we hope to take part in. I didn't like the part where I was cold (I hate being cold) but otherwise it was a nice day and we met some nice people. A special thanks to Jose for giving us the English verison of information. We appreciate the extra attention - I REALLY need to and want to learn better Spanish!

Friday, December 11, 2009

Hay Que (poquito) Joderse - a New and Useful Phrase

So the bathroom stuff has basically not been bad at all - the guy shows up on time, works the whole time, and appears to do an adequate job. I've got a couple things that I think are questionable but since I love to control the world I don't know if they are really problems or not. I need advice! One thing was that they used "pared" thinset for the floor since it was already mixed. I believe wall thinset is a little stronger and they say it is "mismo" but is it really the same? The biggest problem is that there are 7 (out of 200) tiles that have problems - they sound different from the others so I think either the thinset didn't bond or the area wasn't (and won't ever be) level or whatever. One I know on the floor was because they walked on it before it bonded - the one in the middle of the floor. When they put it down I told them they should wait until the last thing (but they had thinset mixed already and tried but apparently didn't avoid stepping on it). They did have a large board on it so when they did step it spread the weight out. The other floor had tiny tiles that spanned less area and maybe that was why they didn't have a problem...these are big tiles. Next time a little smaller tile would be better since the floor may not be level and thinset doesn't compensate for that. But anyway - it doesn't rock (yet), we aren't driving on it, it isn't lifting (yet)....what is better? 1 leave it, grout it and watch it OR have them take it out and possibly wreck other ones doing it? It gets grout Monday or Tuesday.
The ones with sticky notes on them are the questionable ones. One is under the sink (who cares), the other is on the side of the toilet but the toilet doesn't sit on it (who cares) but the other is where you step out of the shower and you step on it when you go to the bathroom - should I care? Do I have them taken out or do we have them grout it and wait and see? I had them use spacers so there is space and I don't think it will affect other tiles. Is not replacing them just waiting for trouble? HQJ...


There is one partial tile in the shower I will insist they change out since it is in the wet area. Then there are 2 and maybe 3 behind the door...


The door will be over this area unless you close it when you are in there - but there is no traffic in that area - take them out or grout them in?

The other adventure is with the glass wall. I have closely monitored them - I can see what they are doing. but for an instant I blinked or something and when I went in there they were setting blocks on the white track for a dry run....but incredibly had already cut and screwed in the track that was TOO SHORT! I had laid out the wall rows and already snapped all the spacers into the correct shapes for the perimeter, bottom etc and they snatched from the wrong row and everything got mixed up! The guy did a curved glass wall before but apparently had not used spacers (they prefer to just eyeball things I guess) so off it came, I took charge, laid it out with the spacers and told them to measure 3 times and cortar uno or better yet - put the white track down and cut it after the wall is done! The too short piece can be used for the vertical part since the track doesn't come long enough for one piece anyway but jeez... this is basic. So I run down because one guy disappears to mix the mortar and I want to make sure it is the glass block mortar and that he puts in the fortifier (anti mold stuff). I had already piled the two together and marked the ratio so there wouldn't be mistakes. (they prefer to "eyeball" measure which tells me they do this a lot or that they don't do this a lot). Then I told them I was in charge of putting in the spacers so they wouldn't be upside down, or the wrong ones in the wrong place or placed so you could see them (they stay in). We joked around some and they are nice people but I do have to monitor them. So the mortar is not completely filling the outside of the blocks and I am freaking - es mal, no buena, por que no de aqui...lots of pointing. Then they tell me this is the first part and after they put something else to make the lines neat and finish it. I tell them NO thinking they want to grout it and after much discussion I get it - un otro capa de mismo despues - they will neaten it up after the wall is made, dry and then they finish it with more glass mortar so it look nice. The first part is to set the anchors, the metal reinforcers and spaces. So this is what stuff looks like so far.It looks great!

The color is off on the photos but I need advice before Monday when they return. Bust up and replace the bad tiles or leave them and see how it goes. Also, how long before you know if there are really any problems? We have the other bathroom to do and if everything holds I think the job is good enough to have them do the other. What do you think?

Wednesday, December 9, 2009

Bathroom Progess - Muy Rapido!


Day one involved demo of a majority of the bathroom. Carlos showed up at 7:10 and stayed until around 1:30 chipping away at the old tile. He got most of the walls and the front floor done, and the floor in the shower was waiting for the next day.

He showed up around 7:30 (his mother dropped him off) and chipped away at the rest and hauled the basura to the truck so I could take it to the dump (about 8 minutes away). I was pretty pleased that it went that fast, as fast as I thought it should, and was happy he showed up pretty much on time and worked the whole time. He didn't want a sandwich for lunch so he just had water occasionally. So now it is Tuesday and Jeff hasn't replaced the really old valve assemblies for the three shower knobs. We aren't changing locations of anything so he needed to replace the stems before the tile went up and who knows what the thingys are called. This is not something I could do. I went to HBQ plumbing or whatever it is called to get replacements but of course only Spanish speakers were there, my photos didn't show sizes, and they needed me to hand them the old ones so I could get new ones. I went home, turned off the water (keep in mind I am filthy from having just shoveled tile out of the truck into the dump) and gave it my all the get that stem out. It was bending a little, I couldn't turn it, everything was old and corroded and too difficult for me. So I tried to turn it the teeny way back....turned on the water....and water came shooting out of the top shower pipe into the gutted bathroom! Not good. I turned the water off. It is only 2:30. Jeff gets home around 6:45 and I am soooo filthy I just can't stand another minute of filthy tile dust . I can't turn on the water without it squirting full force into the bathroom. I call the neighbor and shower at her house (thanks Awilda!). Jeff gets home and happily can get it so we have water at night. The saga doesn't end. I make him take the day off so he can fix this because the guy is tiling the wall today. The problem is that they are coming at 7, they need water for thinset and HBQ doesn't open until 8. The water has to be off once he removes the parts. So I fill up buckets of water, tell the guys there is una problema poquito hasta mi esposo volver - no aqua. It is fine and they start putting the guide board up so they can start tiling. Until now there has been only 2 days of Carlos. Today Roberto joined him.

Roberto joined Carlos for the tiling event. He mixed the thinset and helped put the guide board up. Let the tiling begin! Meanwhile Jeff has returned with the faucet hardware and put it in and it was in before the guys got to that point. Hooray! I decide to leave Jeff to get the glass blocks for the wall. I head out and as I am almost home call to see if they started the trim. They have. Despite my explaining (to the spouse and tilers) that I wanted the trim 2 tiles high I arrive and it is going up 3 tiles high - uhh uhh. Quiero dos. Off it comes and I get what I want (I thought about this - trim is mainly a line for your eye that has a little more interest than nothing. Three high made you focus on it). So here's one wall with trim. I am not doing trim on the vertical part because it would look weird on the glass block side, looks goofy and is distracting. I want super simple and clean looking! I think it looks great (Jeff would rather the trim go vertical there = he thinks it looks unfinished)! Another little glitch was that I had set aside 6 tiles with a little corner chip in them - set them aside as ones to use when they had to cut tiles. Somehow 2 of them ended up on the wall and were taken down and unchipped ones put in their place - hey, this is the last time we do this bathroom! Jeff didn't notice the chipped corners, the guys didn't notice. Come on...in 2 seconds my eye spotted them! Yeah grout would make it disappear a little more but hey, there is plenty of tile!


They did the tiles in the shower area. I made things super simple for them by getting sheets of 2x2s so there was less to line up and they wouldn't need spacers. All my choices were made with tile size in mind so there would be less cutting involved and things would more likely be level and more evenly spaced. The empty strip is going to have cut tiles in it tomorrow and then the glass wall will be anchored into it. Very few tiles needed to be cut. Tomorrow the cut tiles along the floor will be put in and the main floor. I think it will be a short day. They aren't working Friday, but Monday should be a grouting day and maybe anchoring the hardware for the glass wall. I think Tuesday will be the wall, with Wednesday as a touch up, towel bar, finish the wall day. It is going fast! Do you think it's possible to have a new bathroom by xmas? Right now there are crystal blocks and towel bars under the tree - that's what I am hoping for....then it will be the other bathroom. So so far it is going extremely well I think. After watching and hearing about neighbors having workers not show up, not call, or come at 3 pm instead of 8 I was dreading this. Unless tiles fall off the walls I am pretty darned pleased! I did think about the design so a maximum of whole tiles could be used (for cleaning purposes and installation purposes) but I didn't really think he would show up consistently....but he has. Oh lucky day... he appears to know what he is doing and he comes on time and does it! Yeah!

Looks good, huh? They still need to tile the little wall, do the bottom perimeter which requires cut tiles and finish the floor.

Here's where the sink goes.

This is the sink area and you can see some of the floor has been put down and yes...I did buy spacers for that! Toilet goes on the right. I don't want metal towel bars and stuff since even stainless rusts here. I could only find two styles of porcelin towel bars and I'm not crazy about them but even on the internet it is all metal. So I got an 18 inch for in the shower to hang bathing suits on and a 2 footer for the outside wall. The toilet roll holder is brushed nickel to match the towel bars on the sink and have a low profile. I'm happy with these (once the towels are on there you won't see them anyway. I'm thinking about painting -believe it or not - a pretty bluish, tuqoisish green and getting some dark blue towels.This is hysterical since I couldn't stand all the different blue tiles and now I'm thinking blue? Maybe I'll do a light yellow orange and put orange towels in there - that'd go well with beige. Hmmm, wild purple towels with lavender walls>=? (too girly). The options are endless and all towel color based. Guess it is towel time.